Sometimes the treatment of soundproofing machine to machine is not viable because it is expensive and causes problems in the production process. Construction of noise barriers separating areas with different noise levels is advised in some cases.

Project phases:
1 – Detection of the problem
2 – Analysis of solutions.
3 – Measurement and control of the existing noise.
4 – Construction and application using modular panel Acustimodul-80
5 – Verification of results.